Back to Case Studies

Commercial Systems · AI Demand Modeling & Revenue Architecture

Predictive Inventory & Price Elasticity Optimization

A quantitative crisis-mitigation framework built for a viral D2C/FMCG consumer brand (₹400–₹900 price catalog). When factory production stalled unexpectedly for 90 days, I architected multi-agent AI forecasting models, price elasticity trade-off algorithms, and dynamic product bundling to prevent out-of-stock drop-offs, preserve customer LTV, and maintain continuous revenue runway.

Client Domain High-Velocity D2C / FMCG
Price Spectrum ₹400 – ₹900 Multi-SKU Catalog
Outage Duration 90 Days (60-Day Active Runway)
Core Mandate 0 Stockouts · Preserve LTV
Simulation Stack Claude AI + Colab Python Agents
The Operational Crisis

Manufacturing Stalled with 60-Day Runway Remaining

The client operates a rapidly scaling consumer brand with viral customer acquisition. Due to unforeseen production interruptions, manufacturing had already been frozen for 30 days, with a projected 60 additional days before new batch replenishment could hit warehouses.

At current burn velocity, hero SKUs would deplete in under 18 days. Displaying an "Out of Stock" banner was strictly unacceptable: it would degrade paid ad attribution algorithms, spike CAC upon return, alienate organic customers, and permanently forfeit market share to rivals.

0 Out-of-Stock Badges displayed across 60 days
+18.4% Average Order Value (AOV) via strategic bundling
98.2% Gross margin preservation vs unconstrained forecast
Methodological Blueprint

5-Stage Decision Architecture & Execution Pipeline

An end-to-end systematic process translating messy SKU velocity data into algorithmic pricing rules, dynamic bundle discovery kits, and continuous cash-flow stability.

STEP 01

Forensic Velocity & Cohort Audit

Ingested 90-day historical and lifetime transaction logs. Segmented active inventory across all sizing variants, pack ratios, and cross-purchase affinities.

90d SKU Velocity Lifetime Sales Curves Variant Size Ratios
STEP 02

Multi-Agent AI Demand Forecasting

Parameterized Python AI agents running on Google Colab to forecast 90-day unconstrained consumer demand, simulating runout horizons under status-quo conditions.

Colab Python Agents Stochastic Forecasting Runout Horizons
STEP 03

Elasticity Trade-Off Decision Matrix

Formulated mathematical trade-offs between Hero SKU Price Throttling (preserving units vs churn loss) and Slow SKU Discounting (clearing deadstock vs margin dilution).

Price Elasticity (Ed) Margin Dilution Matrix Churn Risk Analysis
STEP 04

Algorithmic Bundling & Discovery Kits

Synthesized slow-moving variants into high-perceived-value discovery kits and anchor bundles, subsidizing price sensitivity while extending stock lifespan.

Anchor Bundling Stop-Gap Kit Lines Dynamic Tiered Pricing
STEP 05

Zero-Stockout Runway Completion

Maintained 100% active catalog presence across the full 60 days, transitioned smoothly to production restart, and generated surplus cash reserves.

0 Stockout Badges Protected Organic Rank Surplus Cash Flow
Strategic Evaluation

The Core Strategic Trade-Off: Option A vs. Option B

When stock is finite and non-replenishable in the short term, simple price adjustments carry severe second-order penalties. Here is how I quantitatively analyzed both pathways.

Hypothesis Alpha

Price Surge on High-Demand Hero SKUs

Increase price on fast-selling SKUs to intentionally throttle daily sales volume and preserve stock.

Mechanism: Elevate top-selling SKU prices (e.g. ₹699 → ₹849) to dampen demand velocity, forcing the inventory burn rate to match the 60-day runway.
Critical Risk Identified: Price elasticity of demand (Ed). Beyond a +14% price shift in the FMCG consumer tier, cart abandonment spikes exponentially, causing irreversible customer drop-off and damaging organic repurchase loops.
Simulated Revenue Impact: Higher per-unit margin, but severe customer acquisition efficiency loss and long-term brand equity friction.
Hypothesis Beta

Markdown Velocity on Slow-Moving Variants

Identify neglected product sizings/variants and discount them to absorb traffic from hero items.

Mechanism: Discount dormant variants (e.g. niche sizes/flavors at ₹450 → ₹349) to shift consumer attention away from scarce hero SKUs.
Critical Risk Identified: Gross margin dilution and perceived brand cheapening. Massive markdowns erode contribution margin and fail to satisfy customers looking specifically for the hero product.
Simulated Revenue Impact: Rapid clearance of dead capital, but leaves a margin deficit unable to cover overhead during the 60-day disruption.
The Winning AI-Orchestrated Solution: Dynamic Bundling & Elasticity Arbitrage

Combining Controlled Micro-Surges with Curated Discovery Bundles

Instead of executing either blunt approach in isolation, my AI simulation model combined micro-elasticity adjustments with Anchor Bundling:

1
Hero SKU Micro-Calibration (+6% to +8%): Kept price surges strictly beneath the consumer churn elasticity threshold, reducing daily unit burn by 14% without alienating repeat buyers.
2
Anchor Bundle Kits (Hero + Slow Variant): Packaged the scarce hero SKU together with high-inventory slow-moving variants at an attractive combined price (₹1,099), moving 3.4x more slow units per transaction.
3
New Stop-Gap "Discovery Line": Repackaged remaining variant inventory into curated trial sets, maintaining active marketing campaigns without requiring factory manufacturing runs.

Need a full-stack platform,
quantitative strategy, or AI systems?

I work directly with founders and business teams to build high-performance web systems, custom portals, AI workflows, and strategic growth engines.